Low Carbon Compute Sites

Power-Ready Sites.
Zero Grid. Zero Carbon.

Browse our portfolio of low carbon, off-grid sites across the UK — each with private wire connections to 24/7 renewable generation. Accept compute infrastructure in as little as 3 months, or pre-book a fully built modular data centre delivered in 12 months.

7.7MW
Confirmed Pipeline
6
Sites Available
3mo
Fastest Deployment
34MW+
Wider Estate Pipeline
100%
Low Carbon Energy
Phase 1 — Committed Sites

Heads of Terms Signed. Ready in 3 Months.

Agreements signed with the UK's leading AD operator. Confirmed low carbon generation capacity with private wire infrastructure ready for deployment.

BG-001
Hertfordshire, South East
3-Month Ready
Net Capacity
2.6 MW
Energy Source
AD / Biogas CHP
Carbon Status
Low Carbon 24/7
Deploy
3 Months
Low CarbonScope 2 CompliantFibre ConfirmedPrivate Wire24/7 Baseload
Highest connectivity score in portfolio. Proximity to major fibre routes and London interconnects. Largest single site — ideal for anchor deployment.
Register Interest →
BG-002
Essex, East of England
3-Month Ready
Net Capacity
2.1 MW
Energy Source
AD / Biogas CHP
Carbon Status
Low Carbon 24/7
Deploy
3 Months
Low CarbonScope 2 CompliantFibre ConfirmedPrivate Wire24/7 Baseload
Strong regional connectivity with multiple fibre options. Excellent road access for container delivery and servicing.
Register Interest →
Phase 1B — Confirmed Pipeline

Sites Confirmed. Agreements In Progress.

Generation capacity confirmed by our AD partner. Commercial terms under negotiation — available for early commitment.

BG-003
Dalkeith, Scotland
Confirmed
Net Capacity
1.3 MW
Energy Source
AD / Biogas CHP
Carbon Status
Low Carbon 24/7
Deploy
6 Months
Low CarbonScope 2 CompliantPrivate Wire24/7 Baseload
Scottish deployment — strong demand signal for distributed compute north of the border.
Express Interest →
BG-004
Somerset, South West
Confirmed
Net Capacity
0.9 MW
Energy Source
AD / Biogas CHP
Carbon Status
Low Carbon 24/7
Deploy
6 Months
Low CarbonScope 2 CompliantPrivate Wire24/7 Baseload
South West England coverage. Extends geographic diversity of the Beyond Grid network.
Express Interest →
BG-005
Inverness, Scotland
Confirmed
Net Capacity
0.8 MW
Energy Source
AD / Biogas CHP
Carbon Status
Low Carbon 24/7
Deploy
6–9 Months
Low CarbonScope 2 CompliantPrivate Wire24/7 Baseload
Highland Scotland. Natural cooling advantage for compute workloads. Edge deployment opportunity.
Express Interest →
Edge Compute — Micro Node

Rural Edge. Sovereign Data Hosting.

Proof-of-concept micro-node for localised, sovereign compute — ideal for edge inference, IoT, or data sovereignty requirements.

BG-006
West Wales
HoT In Progress
Net Capacity
185 kW
Energy Source
AD / Biogas CHP
Carbon Status
Low Carbon 24/7
Deploy
3 Months
Low CarbonScope 2 CompliantPrivate Wire24/7 BaseloadRural Edge
Smaller-scale edge compute site. Beyond Grid's first micro-node — demonstrating the model at community scale. Council partnership opportunities in development.
Express Interest →
BG-007 — BG-019+
UK-Wide Estate
34MW+ Pipeline
Combined Capacity
34MW+
Energy Source
AD / Biogas CHP
Coverage
England, Wales, Scotland
Deploy
2027–2029
Low CarbonScope 2 CompliantPrivate Wire24/7 BaseloadMulti-Site Rollout
Beyond Grid holds right of first discussion across an extensive UK generation estate — 20+ low carbon AD sites spanning England, Wales and Scotland. Available for multi-site rollout with a single operator partner.
Enquire About Portfolio →

Pre-Book Your Compute.

Don't want to wait? Reserve capacity now and we'll deliver a fully built, low carbon modular data centre in 12 months. You choose the site, we handle everything — power, private wire, structure, cooling, connectivity. Pay in advance to secure your allocation and lock in a deployment slot.

01
Reserve & Commit
Select a site from our portfolio and pay a reservation deposit to secure your capacity allocation. Lock in your deployment slot and power pricing.
02
We Build It
Beyond Grid delivers the full modular data centre — private wire connection, containerised infrastructure, cooling, and connectivity. 100% low carbon power from day one.
03
You Plug In
Receive a turnkey, compute-ready facility within 12 months. Bring your own hardware, deploy your workloads, and start operating — fully off-grid, fully renewable.

Capacity from 185kW to 2.6MW per site. Multi-site packages available across the UK. All sites powered by low carbon AD/biogas generation.

Pre-Book Capacity →

Interested in a Site?

Tell us what you're looking for and we'll match you to available low carbon capacity. All sites offer private wire renewable energy — no grid connection required.

  • 100% low carbon — Scope 2 compliant from day one
  • 24/7 baseload generation (not intermittent)
  • Ready to accept compute in as little as 3 months
  • Turnkey build-to-order delivered in 12 months
  • Private wire — bypass the grid queue entirely
  • Flexible capacity from 185kW to multi-MW